3
     'ˆÃ�þFóË8Ù’Gšl¤yŸç×ƒ�¹ÖÅÔ 
ˆ    '"use strict";
exports.getWeekYear = getWeekYear;
var _index = require("./_lib/defaultOptions.cjs");
var _index2 = require("./constructFrom.cjs");
var _index3 = require("./startOfWeek.cjs");
var _index4 = require("./toDate.cjs");

/**
 * The {@link getWeekYear} function options.
 */

/**
 * @name getWeekYear
 * @category Week-Numbering Year Helpers
 * @summary Get the local week-numbering year of the given date.
 *
 * @description
 * Get the local week-numbering year of the given date.
 * The exact calculation depends on the values of
 * `options.weekStartsOn` (which is the index of the first day of the week)
 * and `options.firstWeekContainsDate` (which is the day of January, which is always in
 * the first week of the week-numbering year)
 *
 * Week numbering: https://en.wikipedia.org/wiki/Week#The_ISO_week_date_system
 *
 * @param date - The given date
 * @param options - An object with options.
 *
 * @returns The local week-numbering year
 *
 * @example
 * // Which week numbering year is 26 December 2004 with the default settings?
 * const result = getWeekYear(new Date(2004, 11, 26))
 * //=> 2005
 *
 * @example
 * // Which week numbering year is 26 December 2004 if week starts on Saturday?
 * const result = getWeekYear(new Date(2004, 11, 26), { weekStartsOn: 6 })
 * //=> 2004
 *
 * @example
 * // Which week numbering year is 26 December 2004 if the first week contains 4 January?
 * const result = getWeekYear(new Date(2004, 11, 26), { firstWeekContainsDate: 4 })
 * //=> 2004
 */
function getWeekYear(date, options) {
  const _date = (0, _index4.toDate)(date, options?.in);
  const year = _date.getFullYear();

  const defaultOptions = (0, _index.getDefaultOptions)();
  const firstWeekContainsDate =
    options?.firstWeekContainsDate ??
    options?.locale?.options?.firstWeekContainsDate ??
    defaultOptions.firstWeekContainsDate ??
    defaultOptions.locale?.options?.firstWeekContainsDate ??
    1;

  const firstWeekOfNextYear = (0, _index2.constructFrom)(
    options?.in || date,
    0,
  );
  firstWeekOfNextYear.setFullYear(year + 1, 0, firstWeekContainsDate);
  firstWeekOfNextYear.setHours(0, 0, 0, 0);
  const startOfNextYear = (0, _index3.startOfWeek)(
    firstWeekOfNextYear,
    options,
  );

  const firstWeekOfThisYear = (0, _index2.constructFrom)(
    options?.in || date,
    0,
  );
  firstWeekOfThisYear.setFullYear(year, 0, firstWeekContainsDate);
  firstWeekOfThisYear.setHours(0, 0, 0, 0);
  const startOfThisYear = (0, _index3.startOfWeek)(
    firstWeekOfThisYear,
    options,
  );

  if (+_date >= +startOfNextYear) {
    return year + 1;
  } else if (+_date >= +startOfThisYear) {
    return year;
  } else {
    return year - 1;
  }
}
  !   )ˆÌ�þYv6–nRÉÜcüÿ×„BpÖËÅÔ 7´    )// Copyright (C) 2001 Vladimir Prus <ghost@cs.msu.su>
// Copyright (C) 2001 Jeremy Siek <jsiek@cs.indiana.edu>
// Distributed under the Boost Software License, Version 1.0. (See
// accompanying file LICENSE_1_0.txt or copy at
// http://www.boost.org/LICENSE_1_0.txt)

// NOTE: this final is generated by libs/graph/doc/transitive_closure.w

#ifndef BOOST_GRAPH_TRANSITIVE_CLOSURE_HPP
#define BOOST_GRAPH_TRANSITIVE_CLOSURE_HPP

#include <vector>
#include <algorithm> // for std::min and std::max
#include <functional>
#include <boost/config.hpp>
#include <boost/bind/bind.hpp>
#include <boost/graph/strong_components.hpp>
#include <boost/graph/topological_sort.hpp>
#include <boost/graph/graph_concepts.hpp>
#include <boost/graph/named_function_params.hpp>
#include <boost/graph/adjacency_list.hpp>
#include <boost/concept/assert.hpp>

namespace boost
{

namespace detail
{
    inline void union_successor_sets(const std::vector< std::size_t >& s1,
        const std::vector< std::size_t >& s2, std::vector< std::size_t >& s3)
    {
        BOOST_USING_STD_MIN();
        for (std::size_t k = 0; k < s1.size(); ++k)
            s3[k] = min BOOST_PREVENT_MACRO_SUBSTITUTION(s1[k], s2[k]);
    }
} // namespace detail

namespace detail
{
    template < typename TheContainer, typename ST = std::size_t